METHODOLOGY

What is Kanban?

Kanban is a flow-based method: work is shown on a board, the amount in progress is capped, and new items are pulled in only when capacity frees up, without fixed iterations.

Last reviewed: byAtta Ur Rehman LinkedIn ↗

Kanban rests on two ideas: show all the work, and restrict how much of it is in progress. Every item goes onto a board with a column per stage (to do, in progress, review, done), and each active column has a ceiling on how many items it may hold. Once a column hits its ceiling, no one picks up anything new until an item leaves it. The ceiling is the entire purpose, because it makes the team finish work before taking on more.

Where it differs from Scrum is rhythm. Scrum groups work into fixed sprints and plans again at the end of each one. Kanban does without sprints: work is pulled in steadily whenever capacity opens up, and priorities can change at any time without waiting for a sprint to close. You get no commitment ceremony, no sprint review and no artificial two-week container. Each is a way of reaching the same agile aim: short feedback loops and the freedom to change direction based on evidence.

Choose Kanban when work turns up unpredictably and is driven by interruptions (support, operations and platform teams), or when a team has matured to the point where sprint structure is nothing but overhead. Choose Scrum when a team needs the rhythm and the built-in review to develop delivery discipline, or when stakeholders rely on a regular demo schedule to plan.

Here is what a WIP limit really does to a team. Put a cap of three on the “in progress” column for a team of five, and at times two people will have no task of their own to begin. The gut response is to call that waste, idle engineers. It is the reverse. Those two must now help finish the three items already underway, review a colleague’s work or pair on whatever is blocked, rather than opening a fourth task and stretching the team further. The discomfort of a full column is the method doing its job: it turns “everyone busy, nothing shipping” into “less in flight, and things genuinely getting done”. Teams that cannot sit with that short idle spell quietly lift the limit until it no longer restricts anything, then cannot understand why throughput stayed flat.

The honest version: the value lives in the WIP limits, and they are also what teams most often quietly drop. Without a WIP limit, a Kanban board is merely a to-do list with more columns. When a team starts five things and completes none, the answer is the limit, not a larger board.

// FAQ

FAQs

It is a method built around flow. Work is displayed on a board, the number of items in progress at any moment is capped (the WIP limit), and new work comes in only once there is spare capacity. Iterations are not fixed, and priorities may change whenever needed.
Scrum groups work into fixed sprints, each opening with a commitment and closing with a review. Kanban pulls work continuously under WIP limits, without sprints, so priorities can move at any time. Kanban fits unpredictable work full of interruptions and experienced teams; Scrum fits teams that need a set rhythm to build discipline.
When the team leaves out WIP limits. With no ceiling on work in progress, the board becomes a to-do list with more columns, and people start more than they complete. The limit is what pushes work through to done; remove it and the method is gone.