Software Takeover for Code Another Team Built
Software takeover lets your product keep moving after the team that built it has gone. A paid assessment comes first; then we secure access and ownership and rank the fixes required so you can build, release and maintain it safely. Rewriting it only happens with a business case.
Stop in any week. If we did not impress you, the latest week is refunded. We never track hours.
- 300+ products built
- 14+ years experience
- No-Bullshit Guarantee
DIRECT ANSWER
Software Takeover fits when a handover from a vendor or team means getting access back, writing documentation, making releases stable and setting up a safe way to keep maintaining the product.
BEST FOR
- A product moving to a new agency, freelancer, software provider or in-house engineering owner.
- Code already in production whose risks must be understood before anyone maintains it or adds features.
NOT BEST FOR
- Rewriting from scratch without first looking at the system you have.
- A handover where nobody can grant access to the repository, the infrastructure or the stakeholders.
What a takeover really hands you
Clean handovers almost never happen. Whoever made the decisions has left, the docs are sparse or out of date, and no one knows which file is safe to edit. Most of the cost in a takeover comes not from new code but from working out choices another person never documented. Before we agree to any timeline, we put an honest price on that risk.
- ✓Decisions nobody wrote down. Business rules and architecture choices that only the former team remembers.
- ✓Messy access. Repositories, CI, cloud accounts, DNS and secrets spread over people’s personal accounts.
- ✓Security and dependency debt. Keys that leaked, libraries never patched and versions that no longer receive fixes.
- ✓Afraid to release. Without tests or a way to roll back, no one dares to ship, and the backlog stalls.
Inside the paid takeover assessment
A fixed scope over one to two weeks. The written report belongs to you, whether you carry on with us or not.
Review of the existing codebase
The architecture, how good the code is, coupling you cannot see at first, and which items are quick wins and which are structural risks, explained in plain words.
Access to repositories and infrastructure
We list every repository, CI/CD pipeline, cloud account, domain and secret and move them into accounts that you control, so no single person can block you again.
Missing documentation
What one person used to just know gets written down: how to set up, how to deploy, how environments are configured and why those choices were made.
Review of security and dependencies
Secrets left in the open, old or vulnerable dependencies, access control that does not work, and the order in which patches really need to happen.
The handover, step by step
We move ownership over in stages, and production keeps running throughout.
Paid assessment
We get access, audit the code and give you a written plan plus a fixed-price offer, all before any significant code changes.
Knowledge transfer
Where we can, we interview the former provider or team and record their knowledge while they are still reachable.
Stabilization
The urgent damage comes first: security gaps, risks to data and the bugs users are hitting.
Managing release risk
With tests, CI, preview deployments and rollback in one command, releasing no longer feels risky.
Maintenance and further development
After that we keep the product running and get the roadmap moving again, either on a retainer or against a signed scope.
Where the assessment sends you next
A full takeover is not always the right move. The assessment recommends the honest choice, even if that means less work for us.
You only need it safe and stable
When the main job is spotting regressions and keeping a live product in good shape, you need a QA partnership rather than a full takeover.
Go to Software Quality AssuranceAI tools wrote the code
Code produced with Lovable, Cursor, Bolt or a similar tool breaks in other ways, so it needs a different kind of fix.
Go to Vibe Coding Production ReadinessComplete it and keep developing
When you want new features and an active roadmap, we take over the product and handle development from start to finish.
Go to Software DevelopmentPricing
Up front, you only commit to paying for the assessment. Any later work is quoted based on what the assessment turns up.
Takeover assessment
Fixed scope
Takes one to two weeks. The fixed price is set after a brief intro call, and it counts toward the engagement if you go on with us. The written report is yours in any case.
Takeover and further development
Monthly or fixed
Continuing maintenance and new features, either on a monthly retainer or through a signed fixed-scope contract for a defined piece of work. We quote it once the assessment is done and not earlier.
Change agency, or stay with your current team?
In some cases, stay with your team.When the numbers did not add up, we have advised clients against switching. Onboarding time, reverse-engineering and lost context can end up costing more than the problem you started with. If it is cheaper and quicker to keep your team and have us coach them to the finish line, we tell you.
Speak with an engineer
A handover solid enough to build on
Sample deliverables from a takeover assessment. We work out what your team needs to keep the current product maintained and released.
Code, access and ownership
A map of the repositories, environments, deployments and dependencies, plus who owns each system.
A transition backlog
Continuity risks and documentation gaps in priority order, the first maintenance tasks and the takeover’s scope.
A verified handover
The build and deploy path, the main user flows and monitoring all checked, with named owners for support and for rollback.
Evidence, not claims
CoreMax Cloud: an EHR, billing and surgical practice platform was failing in production; we took it over, resolved the critical issues and rebuilt its architecture on AWS for 1M+ users and 10M+ health records. CloudMedx: on a healthcare SaaS already in use, we delivered 20+ improvements clients could see, among them schema migrations with zero downtime. Boston Harbor FC: we inherited the existing voting pages, rebuilt them and repaired an AWS caching fault that stopped vote emails from going out.
Failing surgical EHR: taken over and re-architected on AWS to target 1M+ users.
HIPAA-sensitive SaaS: APIs, React apps and zero-downtime migrations.
Voting pages rebuilt in Next.js; an AWS cache breaking vote emails fixed.
This is a selection from our founder’s engineering work, not the full portfolio; we have built more than 300 products.
Legacy systems: review first, then decide what to change
Give releases and recovery a named owner
Fewer follow-ups, sharper decisions.
We do the groundwork. You make the call.
For eligible done-for-you work, our goal is no more than 45 minutes a week of routine sponsor review, which includes reading, meetings, messages and normal feedback from all the reviewers you name. Setup, operator trials and decisions that need business authority get their own time budgets, agreed beforehand. Total client time is tracked too. Should our preparation make you miss the routine goal for 2 eligible weeks in a row, we adjust the format and handle the additional preparation at no extra fee. Fractional Co-Founder is still a hands-on collaboration.
Ownership that someone else can prove in practice
Real ownership means a different capable person can take your instructions and carry out the agreed operating tasks. Sort the three changes you expect most into self-service, supported work or a new quote. An eligible build still includes a handover sized to it; the package below adds a more complete rehearsal on a system we know.
A one-off package, covered by the acceptance and fee-protection milestones shown below. Terms for the weekly retainer and Fast Lane apply only to those engagements.
Operational independence exercise
A second capable operator shows they can carry out the agreed tasks.
Done within 5 business days after the booked start, once ready, and the operator’s slot.
- A single skilled operator on the receiving side; one service, one environment and one existing data source.
- A setup from scratch, a deployment to staging, the restore or export already in place and one everyday change to configuration or content.
- A throwaway sample of no more than 1 GB; a session of at most 90 minutes; one round of correction and retest.
Before booking: A system we know, whose setup, deployment and recovery steps work, with authorized access and an operator who has the baseline skills agreed.
Payment milestones: One part of the fixed fee falls due when you accept the preparation and the corrected instructions; the remainder is due only after the agreed rehearsal succeeds.
Scope, acceptance and how your fee is protected
What earns the fee: The operator completes the agreed tasks from the corrected instructions you own, with no unwritten knowledge from the author. We note any hints given, permissions used, gaps still open and whether the operator was a Devoun stand-in or someone external.
Scope limits: Building new backup infrastructure, repairing a broken deployment, training beginners and investigating complex recovery are scoped separately. A basic handover you are already owed under a build is not billed twice.
If an agreed milestone fails, we get one chance to correct it within 5 business days. Should it fail again, we waive the fee not yet earned, or refund any unearned amount you prepaid, within 10 business days. If a failure on Devoun’s side leaves the whole package unusable, the full package is refunded within those same 10 business days after the correction attempt. Before booking we write down the scope, the acceptance criteria and any time spent waiting on you or a vendor; when a dependency stops the relevant clock, we give the reason and the new date. These terms go into your scope and do not reduce any rights you already have. Business days for these packages run Monday to Friday, public holidays excluded. On top of that, our satisfaction guarantee applies to the agreed fixed-price milestone: if you are not satisfied, its fee is refunded and you do not have to explain why.
Be ready for the day the usual path breaks
A one-off package, covered by the acceptance and fee-protection milestones shown below. Terms for the weekly retainer and Fast Lane apply only to those engagements.
Check one recovery exercise
Find out if your current recovery path works for the scenario you name.
Done within 5 business days after the booked start, once ready.
- A single documented scenario for restore, or for safe stop and recovery; one service and one data store in an isolated staging setup.
- No more than 1 GB of representative data and 5 integrity checks.
- The time it actually took, the data outcome, a corrected runbook and one round of correction and retest.
Before booking: A JavaScript/TypeScript application we know, a supported recovery procedure that already exists, data that can be thrown away and an authorized operator.
Payment milestones: One part of the fixed fee falls due when you accept the preparation and the runbook; the remainder only once the recovery result is backed by evidence.
Scope, acceptance and how your fee is protected
What earns the fee: In staging, the named scenario and its integrity checks pass, and we write down the limits, the time it took and who owns it next. It tests recovery more thoroughly than the brief operator rehearsal does.
Scope limits: Designing new recovery architecture, injecting failures into production, forensic restores, reconciling across systems, continuing coverage and any uptime or RTO guarantee are all scoped separately.
If an agreed milestone fails, we get one chance to correct it within 5 business days. Should it fail again, we waive the fee not yet earned, or refund any unearned amount you prepaid, within 10 business days. If a failure on Devoun’s side leaves the whole package unusable, the full package is refunded within those same 10 business days after the correction attempt. Before booking we write down the scope, the acceptance criteria and any time spent waiting on you or a vendor; when a dependency stops the relevant clock, we give the reason and the new date. These terms go into your scope and do not reduce any rights you already have. Business days for these packages run Monday to Friday, public holidays excluded. On top of that, our satisfaction guarantee applies to the agreed fixed-price milestone: if you are not satisfied, its fee is refunded and you do not have to explain why.
A ready plan for when a dependency shifts
A dependency change that is tested, on a limited version path
A one-off package, covered by the acceptance and fee-protection milestones shown below. Terms for the weekly retainer and Fast Lane apply only to those engagements.
A single eligible dependency family
A patch or minor upgrade, tested and reversible, along a path confirmed as supported.
Fixed quote once ready; eligible scope is finished within 5 business days after the booked start.
- A single direct npm dependency family, no more than 5 related first-party packages, in one repository.
- A defined patch or minor path that stays inside the same major version; tests that work today.
- An updated lockfile, notes on compatibility, 3 agreed journeys checked in staging and a commit for rollback.
Before booking: A JavaScript/TypeScript web app we already maintain. A preflight check has to confirm the precise version path, limited behavior changes and a staging setup that can be repeated.
Payment milestones: An eligible fixed quote is split into milestones for accepted preparation and for a result backed by evidence; one round of correction and retest and the package remedy apply.
Scope, acceptance and how your fee is protected
What earns the fee: The named checks pass on the version path we agreed, and you get the accepted change, the evidence, compatibility notes and the rollback.
Scope limits: Major upgrades, schema or data migrations, changes of runtime or platform, native builds, unsupported versions and open-ended undocumented behavior each need their own scope. Calling something a patch does not by itself prove it is compatible.
If an agreed milestone fails, we get one chance to correct it within 5 business days. Should it fail again, we waive the fee not yet earned, or refund any unearned amount you prepaid, within 10 business days. If a failure on Devoun’s side leaves the whole package unusable, the full package is refunded within those same 10 business days after the correction attempt. Before booking we write down the scope, the acceptance criteria and any time spent waiting on you or a vendor; when a dependency stops the relevant clock, we give the reason and the new date. These terms go into your scope and do not reduce any rights you already have. Business days for these packages run Monday to Friday, public holidays excluded. On top of that, our satisfaction guarantee applies to the agreed fixed-price milestone: if you are not satisfied, its fee is refunded and you do not have to explain why.
Once ownership is settled, plan the controls
FAQs
Moving software over from a previous provider
Optional Fast Lane
Want it earlier?
We hold back extra capacity for you, which means a larger share of agreed work each week or the same scope on an earlier date, while every quality check stays in place. If we miss the earlier date you booked, you get the full Fast Lane surcharge back.
Available for any milestone you choose, priced once we have checked readiness.
Other Modernization & Support services
Legacy Modernization
Bring a system you already operate up to date step by step: upgrades, replacing parts gradually and moving data, with cutovers rehearsed first.
Explore the scopeSoftware Maintenance
Updates, security patches, bug fixes and minor changes to software in production, with scope and response times set in each contract.
Explore the scope